More experiments with clay
The daub walls of the roundhouse had several small cracks. In a 2m stretch, the cracks were filled with clay subsoil and smoothed over, creating a more visually appealing surface […]
The daub walls of the roundhouse had several small cracks. In a 2m stretch, the cracks were filled with clay subsoil and smoothed over, creating a more visually appealing surface […]
The daubing of the roundhouse wall has now been completed and we have been lucky enough to have had two days of workshops led by the wonderful folk from Pario […]
We are now using a different subsoil mix for the roundhouse daub. A bit sandier in composition, making it a lot easier to mix and apply than the previous clay […]
Work on the Iron Age roundhouse has continued with the walls and roof dome all now sufficiently woven with hazel. The short ridge line, coupled with the porch inset into […]
The volunteers have been doing stirling work with the Saxon hall, which has started to gradually turn white. Not snow but the first coat of limewash on the gable end. […]
On one side of the Roman building a traditional Roman deception has been carried out. The wet lime render has been scored to make it resemble a face of finely […]
Once more to the breach dear friends, once more. For to close up the wall with our English daub. In November there’s nothing so becomes a person as modest shivering […]