Starting at floor level
The top coat of the rammed earth floor is being developed in the longhall. Recipe: 2 barrows of sieved clay subsoil, one barrow of sand, 2 buckets of lime, an […]
The top coat of the rammed earth floor is being developed in the longhall. Recipe: 2 barrows of sieved clay subsoil, one barrow of sand, 2 buckets of lime, an […]