Cob layer number 4 has gone up on the Roman building and we are now above the bottom of the windows. 2 more lifts should see us to the top of the walls. Just enough time for them to dry out before the roof trusses go on at the beginning of November. The work was carried out by machine and woman power while the men took an advisory role.