Roman refurbishment

Both ends of the Roman building have had work done recently. The furnace end has been completely re-limewashed and the fake ashlar block stonework redone with a mixture of red ochre and linseed oil. That seems to avoid the problem of the red running which we had before. At the front end the planks of the porch are on, ready for the stone tiles which have been estimated to weigh 1.3 Minis (not a standard Roman measurement).