A roveing we will go!

The first door is hung on the longhall and well hung too! The beautiful hinges are attached with bolts and roves. On the inside of the door the end of the bolt is cut to size and hammered to fix it over the rove. Meanwhile in the Roman building the last wall is plastered and the ceiling turns whiter with multiple applications of limewash.

This slideshow requires JavaScript.